Skip to content
English
  • There are no suggestions because the search field is empty.

ESDT + Pathwave Integration Overview (Ericsson Site Digital Twin)

How Pathwave supports AT&T and DSP photo workflows for submitting photos directly into ESDT.

Pathwave’s integration with Ericsson Site Digital Twin (ESDT) creates a seamless, structured workflow for transferring field-captured data into ESDT with the exact formatting and labeling required for AT&T deliverables. The integration eliminates manual handling, reduces errors, and accelerates closeout and quality review processes across the deployment chain.

How the Integration Works

  • Photos captured in the Pathwave mobile app are automatically tagged, categorized, and labeled according to AT&T’s master photo list requirements.
  • When a job is ready for submission, Pathwave pushes the images directly into ESDT, preserving:
    • Required naming conventions
    • Correct photo categories
    • AT&T-specific metadata
    • Standardized ordering and grouping


Why It Matters

  • Pre-Labeling = Consistency: Every image arrives in ESDT organized exactly how AT&T quality teams expect it—no renaming, reshuffling, or reformatting needed.
  • Direct Transfer = Efficiency: Quality teams and COP specialists no longer download, batch rename, re-upload, or sort photos manually.
  • Error Reduction: Automated tagging ensures the most common COP issues—incorrect filenames, missing categories, out-of-sequence photos—are eliminated.
  • Faster COP & Review Workflows: Because the data is already aligned to AT&T’s standards, finalizing closeout packages and quality submissions in ESDT becomes significantly faster.

Impact for AT&T Programs

The consistent structure from Pathwave to ESDT ensures:

  • Smoother collaboration between field crews, back-office teams, and AT&T reviewers
  • Higher first-pass acceptance rates
  • Reduced rework
  • A true “single source of truth” between field capture and ESDT asset models

What the Integration Provides

  • One-click photo submission to ESDT
  • Automatic mapping to the correct ESDT Site and Project
  • Support for ASIS (PreCX) and ASBUILT (PostCX) photo submissions
  • Correct AT&T foldering and naming applied automatically
  • Faster COP and quality review turnaround

Related Articles